Costs of Personnel:
If you were to have a professional budget then you would follow these prices roughly for the daily and weekly prices of a Camera Operator, Lighting Camera, Editor and Sound Recordist.
After vigorously researching and looking into the rates at BECTU which stands for Broadcasting, Entertaining, Cinematography and Theatre Union, I can see that they have provided me with the information in which shows the costs/ recommended amount to spend on daily and weekly rates of crew which would be working around 10 hours daily and overall 6 days a week.
In terms of the Camera Operator:
The prices for Daily were around £371 - £620
The prices for Weekly were around £2,226 - £3,720
In terms of the Lighting Camera:
The prices for Daily were around £373 - £1,169
The prices for Weekly were around £2,238 - £7,014
In terms of the Editor:
The prices for Daily were around £157 - £176
The prices for Weekly were around £942 - £1,056
And lastly, with the Sound Recordist:
The prices for Daily were around £214 - £240
The prices for Weekly were around £1,284 - £1,440
Friday, 14 July 2017
Risk Assesment
Risk Assessments are important for not only your crew but for everyone involved within a production. This will allow everyone to be aware of the potential risks which are there within a production. An example of a couple risks which could potentially be there would be perhaps;
Wet floors, wires...
Here is an example
The full example will be available with the link below.
https://www.filmsourcing.com/film-production-risk-assessment/
Wet floors, wires...
Here is an example
HAZARD | WHO IS AT RISK? | CONTROLS | SEVERITY OF INJURY | CHANCE OF INJURY | RISK | ADDITIONAL CONTROL MEASURES |
Falling from height | Camera operator | Scaffold erected by competent contractor to industry standard. Guard-rails, mid-rails and toeboards in place. Safe access to platform. | Serious | Low | Low | Access onto mobile tower platform restricted to camera operator. Camera operator instructed not to lean over or stand on guard-rails. |
Falling objects and equipment | People at ground level | Guard-rails, mid-rails and toeboards in place. | Serious | Low | Low | All equipment Secured to scaffold. No loose items. Barriers and warning signs erected to restrict access below tower scaffold. |
Scaffold falling over | People at ground level | Scaffold erected and regularly inspected by competent contractor. | Serious | Low | Low | Scaffold checked before use. Scaffold not to be used in event of bad weather. |
The full example will be available with the link below.